Wednesday, March 26, 2008

Trail Work - Wabash Trace

It was a warm but windy yesterday. Really wanted to ride, but not ready to buck the wind. Greg was assembling a crew to work on the Wabash Trace. I decide to fore go the ride and help get the Trace in ready for the riding season.

We divided up on 3 crews: 1) grading the trail surface 2) rack out tracks from the grader 3) tree/dead fall clearing.

Wish there was a way to stop damage of the trace caused by inconsiderate people - be they be bike riders, equestrians, or motorized (illegal) vehicles. Some sections need a lot of grading because of travel on the Trace when the surface is soft.

No comments: